The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Simulation of the Load Rejection Transiting Process of Acute Fluctuation for Hydropower Station
Author(s): 
Pages: 4-6+37
Year: Issue:  1
Journal: Hydropower Automation and Dam Monitoring

Keyword:  simulationcalculation of regulation guaranteelarge oscillationload rejection comparison;
Abstract: In this paper,according to the south of a large hydropower station,we simulated hydraulic turbine load rejection transient process.Under the support of calculation software-matlab,pressure change curves and speed change curves were simulated,and then,the maximum pressure of the diversion system and the maximum rotating speed at the end of the spiral case has been showed.Consistency between simulation results and measured results have been verified,reference can be provided for calculation of regulation guarantee for the same type hydropower station by these comparative results.
Related Articles
No related articles found