3-D finite element analysis on the stability of surrounding rock of underground building of a hydroelectric station on the Lancangjing River
Author(s): 
Pages: 36-39,66
Year: Issue:  1
Journal: HYDROGEOLOGY AND ENGINEERING GEOLOGY

Keyword:  三维有限元数值模拟地下洞室群围岩稳定性;
Abstract: 在岩体结构模型概化的基础上,采用三维有限元数值分析方法,系统研究了澜沧江某大型水电站大跨度、高边墙地下洞室群开挖完成后围岩的二次应力场、变形场和塑性破坏区的变化特征.总结了地下洞室群围岩应力、变形和破坏区的分布特征和变化规律,为洞室群稳定性评价和工程施工设计提供了基础资料和参考依据.